The Exchange Build Update May 2022

Progress has been good over the last month with the pour of the concrete floor slab to level 10 being achieved and completion of the stair core precast twin wall panels to level 10 installed.

d9546a57-b7b8-4f1b-8d88-b769edc13e2c

The SFS and weatherboard are ongoing with windows, M&E containment and ground floor brick façade progressing during this time.

d0f33296-3369-473a-8a59-604dd05b17c0

Speak to us

For more information on The Exchange or any of our other developments, call us on 01942 251945 or email info@heatongroup.co.uk

 

 

 