The Exchange Build Update April 2022

 

Over the past month, the team at The Exchange have made great progress with the concrete frame erection, as we are now up to the 9th floor with the precast twin wall cores following right behind.

 Exchange  Build Update 1

Concrete framing installed to the 9th level

Also making progress is the installation of the steel formwork, with concrete infill stairs to core B, SFS to levels 0 – 3 and ground floor temporary internal fit out. In the next period we will be commencing the GRP floors to the core risers, above ground drainage and M&E containment