Over at The Exchange, our construction team have now completed the first floor concrete floor slab. This has now allowed us to progress with the installation of the 1st - 3rd floor precast columns.  

 

The Exchange Update

Ground floor concrete complete with columns progressing on to 1st-3rd floor elevation

Over the next period we will be continuing with the works to the temporary flooring system on the 2nd floor,  this will then allow us to complete works to the 2nd floor slab.

Works are also progressing with the installation of the precast double story columns and temporary works to support the 2nd floor slab. 

 

Build Update - The Exchange 2

Temporary flooring installed to floor 2 

The stair and lift cores (which are made from precast concrete twin wall structure) are being installed as we progress through the floors. 

The Exchange.3

Concrete double story columns 

 